Building Description
Major addition completed in 2001.
Wet sprinkler system covering approximately 90%.
Heavy power: 480Y/277V, 3-phase, 4-wire, 2500 amp.
Approximately 5% office build-out.
Concrete slab-on-grade.
Outside 500-year floodplain (Zone X).
Highway frontage with strong truck access and maneuverability.